Abstract
A companion paper introduced a Bayesian analysis methodology to determine appropriate non-periodic inspection intervals of fatigue-sensitive structures, so that their reliability remains above a prespecified minimum level throughout their service life. This paper extends the methodology to structures with elements subjected to different stress levels. The Bayesian approach presented in this paper is unique and novel in that it allows one to utilize judiciously the results of earlier inspections for the purpose of determining the time of the next inspection and estimating the values of several parameters involved in the problem that can be treated as uncertain. Numerical simulations verify the above-mentioned capabilities of the Bayesian method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.