Abstract

Manufacturing industries frequently face the problem of reducing earliness and tardiness penalties, owing to the emerging concept of the just-in-time production philosophy. The problem studied in this work is the Non-identical Parallel-machine?Earliness-Tardiness Non-common Due Date?Sequence-dependent Set-up Time Scheduling Problem (NPETNDDSP) for jobs with varying processing times, where the objective is to minimise the sum of the absolute deviations of job completion times from their corresponding due dates for the different weighted earliness and tardiness combinations. A Genetic Algorithm-Fuzzy Logic Approach (GA-Fuzzy) has been proposed to select the optimal weighted earliness-tardiness combinations in a non-identical parallel-machine environment. The performance of the combined objective function obtained by the proposed GA-Fuzzy technique has been compared with the solutions yielded by the Genetic Algorithm (GA) techniques available in literature, known as GA with Partially Mapped Crossover Operator (GA-PMX) and GA with Multi-Component Uniform Order-based Crossover Generator (GA-MCUOX). The comparison shows that the proposed GA-Fuzzy technique outperforms both the GA-PMX and GA-MCUOX.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.