Abstract
Climate change and urbanization are taking place more and more strongly, reducing water resources, increasing conflict among water users, especially between profitability of electricity generation and downstream water demand. In particular, Ba river basin has hydropower reservoirs of special importance to the socio-economic development of the Central Highlands. Therefore, this paper simulated the impact of the following factors:electricity price, power output, cost of electricity production, financial cost, corporate income tax, corporate management cost to financial results of 3 hydropower plants: Ba Ha, Hinh and Krong Hnang rivers based on Crystal Ball application. At the same time, combined with the qualitative method and based on the application of SPSS (EFA factor analysis method), general model of 12 risk factors affecting the financial efficiency of hydroelectric plant electricity in Ba river basin in operation phase was proposed. However, in order to have a more comprehensive assessment of the relationship between water - energy – food. It is necessary to study the integrated industry problem related to water resources in the Ba River basin: food, irrigation, domestic water supply, electricity generation, ecological environment.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.