Abstract

This paper provides a real life case study on usage of Next Generation Networks (NGN) and innovative regulatory approach leading to collaboration among competing operators to solve a complex interconnection problem in Bangladesh. It provides background into the existing interconnection regime in a fast developing telecom scenario, intricacies of the interconnection challenges as well as technological and regulatory options available for such situation. It provides details of a collaborative project taken up by mobile operators including incumbent & regulator with the consultancy support from ITU and UNDP to set up a common Point of Interconnect (POI) using NGN technology at Chittagong. The salient features of regulatory approach and innovative technology used for this project as well as action points for further utilization and improvements have also been suggested.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call