Abstract

Traditional Market in big cities is facing challenges from the entrants of modern markets. Uncomfortable building conditions make the traditional market gradually abandoned by the community. Therefore, renovation is needed by many markets including a market in Warung Buncit Jakarta. Generally, a traditional market faces a major problem related to how to manage its waste. Busy market activities every day produce a lot of waste, if waste is not managed properly, then it becomes one of the factors that can damage the environment. This paper discusses the Warung Buncit market renovation design that involves how to manage waste from the beginning of planning phases. The existence of animal traders is the starting point how waste is managed. The purpose of waste is recycled is to changed it as animal feed. The problem arises is where the location of the waste process area in this market, where its land is small and how the design based on analysis of its space programming. By placing the waste treatment area inside the building, the new market design is expected to be a model of how traditional markets in Jakarta are renovated based on waste management.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call