Abstract

These main goals of the restoration in distribution networks are to reenergise loads in the area where the power outage occurs. In this study, a new multi-stage restoration process by the aid of the decision-making tree algorithm is proposed to maximise the restored loads and also to minimise switching operations in the distribution networks with distributed generations (DGs). This method includes three stages of initial restoration, reconfiguration and optimal load shedding. In order to reduce the search space, the network switches are categorised into different sets which avoid moving to any inappropriate result space. The simulations are carried out on the 69-bus distribution system and the results show the high capability and accuracy of the proposed method in the restoration of distribution networks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.