Abstract

Combining with the practical engineering case, the paper summarizes the shallow mining method construction mechanism, construction methods and auxiliary technology. Aiming at the problems in the shield construction, the paper introduces the shield machine equipment’s latest comprehensive construction and technology, especially the shield technology dealing with the conglomerate stratum where the water and boulders is rich. It fills the domestic blank; Deep grouting and pipe roof reinforcement technology are aimed at the specific sources of risk; Whole cross-section of pallet trucks, electric vehicles, automatic metering and other new equipment have been widely applied to the construction site.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.