Abstract

The purpose of this paper is to study an obvious but unexplored approach for scheduling resource-constrained projects. The approach combines elements of heuristic and exact solution procedures. The project considered is decomposed into subprojects, the subproblems are optimally solved, and the solutions are concatenated. The strategy is tested on the benchmark instances of ProGeu. Several of the best known makespans collected in PSPLIB are improved. The algorithm has reduced more best known makespans than the state-of-the-art heuristic for medium-sized projects. The decomposition approach outperforms the truncated version of the branch-and-bound algorithm employed. On average, the quality of the overall solution depends on the size of the subproblems, and on the quality of the solutions of the subproblems—if approximately solved. Consequently, on the one hand, the approach benefits from the progress made in the development of exact solution procedures. But, on the other hand, the results question the rigid construction of schedules by conventional algorithms relying on extensions of partial schedules, and thus provide fundamental insights into the development of exact solution procedures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.