Abstract

In this paper, the resource-constrained project scheduling problem with general temporal constraints is extended by the concept of break-calendars in order to incorporate the possible absence of renewable resources. Three binary linear model formulations are presented that use either start-based or changeover-based or execution-based binary decision variables. In addition, a priority-rule method as well as three different versions of a scatter search procedure are proposed in order to solve the problem heuristically. All exact and heuristic solution procedures use a new and powerful time planning method, which identifies all time- and calendar-feasible start times for activities as well as all corresponding absolute time lags between activities. In a comprehensive performance analysis, small- and medium-scale instances are solved with CPLEX 12.6. Furthermore, large-scale instances of the problem are tackled with scatter search, where the results of the three versions are compared to each other and to the priority-rule method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call