Abstract

The ways in which industrial floors are exploited leads to the requirement for the highest strength of their upper zone. Physical phenomena occurring during the compaction and hardening of the concrete cause different strength distributions. In the top zone of industrial floors, the strength is significantly lower (over a dozen MPa) than the strength in the bottom zone (several dozen MPa). Standard tests of control samples do not detect this fact. Processes for the application and finishing of embedded mineral-aggregate hardeners (dry shakes) can be regarded as uncontrolled. The effects of the use of dry shakes are not evaluated. In combination with the phenomenon of bleeding, they often fail by delamination. This paper presents the results of industrial floor testing. The ultrasonic pulse velocity method with dry point contact transducers was used. The results show how upper layer strength was reduced, and how dry shakes application affected the strength of the floor. The strength distribution in hardened concrete, which delaminated from the rest of the floor was presented as well. The extension of compulsory control tests of concrete samples was proposed. In the authors’ opinion, particular attention should be paid to 3 centimetres of the upper layer.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call