Abstract
Unexpected encounters with very soft, flowing ground and the presence of groundwater led to severe difficulties with the excavation of the headrace tunnel. The traditional design had to be changed to allow for new support methods developed through observations on site and the application of the New Austrian Tunneling Method.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have