Abstract

In order to clarify the creep-fatigue damage process and to evaluate the creep-fatigue life for boiler 2.25Cr-1Mo header stub welds, a series of creep-fatigue tests were performed on partial mock-up specimens of actual plant under simulated plant loading conditions.Creep voids and micro-cracks occurred along the weld toes at an early stage of life and grew to form many short cracks. These short cracks grew both on the surface and through the wall of the stub tube and later coalesced to form one crack. It was proved that there was a correlation between the maximum crack depth and life ratio and also that there was a correlation between the maximum crack depth and the maximum crack length on the surface. A life prediction method was proposed based on these two correlations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call