Abstract
In large scale problems of line balancing, a weak point is to spend a huge effort of calculation when branch and bound method is adopted to solve the problem. Therefore, in this paper, we propose the method which can seek the satisfactory solution by splitting the problem into some partitions. First, the whole problem is divided into several partial problems, the optimal line balancing is investigated in each partial problem, and the results in all partial problems are joined together to get a trial solution for the whole problem. Second, the trial solution is improved by line re-balancing in the joint area of partial problems to search for a satisfactory solution. Furthermore, a computer is used to obtain the satisfactory solution and the result is compared with the result of a conventional method to investigate the efficiency of this proposed method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Japan Society for Precision Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.