Abstract

Process knowledge can be exploited to improve the performance of control charts and it is not unusual to know that a specific variable shifts above or below its mean under an assignable cause. In such a case, a one-sided control chart is common. The available statistical theory for the one-sided tests is used to provide a reasonable compromise for a numerical procedure to design and implement multivariate solutions. Although simulation is used in the analysis, it is not a direct estimate of performance through simulation. Instead, weights are estimated and these are used to easily set a desired on-target average run length. Furthermore, an interesting quadratic programming solution is incorporated into the analysis. Then the statistical results are extended to a partial one-sided case where only some (not all) variables are known to shift in one direction and the numerical procedure is extended to design and implement the charts. A modern method can blend theory and algorithms into a practical solution. We conclude that modern computer software permits an efficient solution to this problem with meaningful performance advantages over traditional multivariate control charts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.