Abstract

Industries such as automotive, LCD, PDP, semiconductor and steel produce products through multistage manufacturing processes. In a multistage manufacturing process, performances of stages are not independent. Therefore, the relationship between stages should be considered when optimising the multistage manufacturing process. This study proposes a new procedure of optimising a multistage manufacturing process, called multistage PRIM (patient rule induction method). Multistage PRIM extends the scope of process optimisation from a single stage to the multistage process, and it can use the information encapsulated in the relationship between stages when maximising each stage's performance. A case study in a multistage steel manufacturing process is conducted to illustrate the proposed procedure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.