Abstract

This paper presents a new mixed-integer linear programming (MILP) model to solve the multistage long-term expansion planning problem of electrical distribution systems (EDSs) considering the following alternatives: increasing the capacity of existing substations, constructing new substations, allocating capacitor banks and/or voltage regulators, constructing and/or reinforcing circuits, and modifying, if necessary, the system's topology. The aim is to minimize the investment and operation costs of the EDS over an established planning horizon. The proposed model uses a linearization technique and an approximation for transforming the original problem into an MILP model. The MILP model guarantees convergence to optimality by using existing classical optimization tools. In order to verify the efficiency of the proposed methodology, a 24-node test system was employed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.