Abstract
Based on the WBS-RBS method, in this study, the risk factors corresponding to the construction risk events of an offshore tunnel foundation pit in Ningbo were identified, and the fuzzy comprehensive evaluation method was used to evaluate the construction safety risk of the project. The system-level risk value was obtained by using the risk event deformation resulting from changes in two factors, namely, “mechanical property of soil” and “stiffness of the envelope structure”, to calculate the new event-level risk value corresponding to the deformation using a finite element numerical model. The findings indicate that the tunnel project has a risk evaluation score of 62.78 and thus falls within the category of high-risk projects. A change in risk factors will alter the likelihood that risk events will occur, which affects the safety risk status of the entire project. When two factors are coupled, a project’s system-level risk can increase dramatically.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.