Abstract

In this paper, multi-objective optimization of energy-aware multi-product failure-prone manufacturing system is explored. The purpose is to determine the best sequence of jobs, optimal production rate and optimum preventive maintenance time for simultaneous optimization of three criterions of total weighted quadratic earliness and tardiness, system reliability and energy-consumption cost. Considering the uncertainties of the problem such as stochastically machine breakdown and maintenance, stochastic processing times as well as NP-hard nature of the problem, it is not possible to propose an analytical solution to this problem. Therefore, two novel algorithms by combining (1) simulation and NSGA-II/PSO and (2) simulation and NSGA-II/GA are proposed for solving this problem. A set of Pareto optimal solutions was obtained via this algorithm. Results show that the both methods converge to a same optimal solution, but the rate of convergence with NSGA-II/PSO is faster than NSGA-II/GA. The algorithms are evaluated by solving small-, medium- and large-scale problems. To the best of our knowledge, multi-product failure-prone manufacturing systems by considering sequence of jobs have not been explored in any paper and for the first time a new hedging point policy is presented for the mentioned problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.