Abstract

This paper addresses the optimization of the continuous-flow model of a single-stage single-product manufacturing system with constant demand and transportation delay from the machine to the inventory. The machine is subject to either time-dependent or operation-dependent failures. The production is controlled by a hedging point policy. The goal is to determine the optimal hedging point, which minimizes the long-run average inventory holding and backlogging cost. Sample path analysis shows that the cost function is convex and sample gradient estimators are derived. A bi-section search algorithm based on simulation and sample gradients is proposed to determine the optimal hedging point.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.