Abstract
Zhangbei demonstration project will be the world's highest voltage level and largest capacity VSC-HVDC power grid, by which millions of kilowatts of renewable energy and pumped storage power will be supplied to Beijing. Due to the uncertainty of wind power and solar power, and the operating range restriction of pumped storage unit, it is urgent to find the solution to the problem of plan making of pumped storage generation and convertor substation after the Zhangbei demonstration project completes. This paper analyses the fluctuation characteristics of renewable energy generation in converter substation, based on the t-location scale, then proposes a multi-objective optimal scheduling strategy for wind power, PV, and pumped storage plant in VSC-HVDC grid, with maximum energy consumption and minimum power fluctuation at the load side and vicinity of the adjusting side as the target, considering the constraints from day-ahead forecasts, VSC-HVDC capacity, unit start-up–shutdown, and state conversion. Simulation results show that authors’ strategy can make use of pumped storage power plant to inhibit the fluctuation of renewable energy power and make the maximum renewable energy consumption within the allowed power fluctuation at the sides, attaining a good balance between energy consumption and grid security.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.