Abstract

This paper deals with the multi-degree cyclic robotic flow shop cell scheduling problem with multiple robots. All the parts are processed successively through the machines with standard processing times while single gripper robots perform the transportation operations of parts between the machines. Due to the special characteristics of the considered problem, a metaheuristic algorithm based on ant colony optimization has been proposed. The proposed algorithm simultaneously determines the optimal degree of the cyclic schedule, the robot assignments for the transportation operations, and the optimal sequence of robots' moves, which in return maximize the throughput rate. The efficiency of the proposed metaheuristic algorithm is examined by a computational study on a set of randomly generated problem instances.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.