Abstract
This paper deals with the cyclic job shop robotic cell scheduling problem with multiple robots. All the jobs are processed in order of their operations on multiple machines with standard processing times and the single gripper robots perform the transportation operations of jobs between the machines. Due to the special characteristics of the considered problem and NP-hard computational complexity, a metaheuristic algorithm based on ant colony optimization has been proposed. The proposed algorithm simultaneously determines the optimal height of jobs in the cyclic schedule, the robot assignments for transportation operations, and the optimal sequencing of the robots moves, which in return maximize the throughput rate. The efficiency of the proposed model is examined by a computational study on a set of randomly generated problem instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.