Abstract

The manufacturing processes of aluminum foil often included seven main steps and the electro-etching is critical step which usually has many parallel machines with three distinct voltage equipments. Therefore, the production scheduling is parallel-machine and its choices of eligibility. In this paper, an agent-based architecture is proposed to develop a parallel-machine scheduling application for this manufacturing environment. There are three types of agents in the proposed system. Each job/machine is viewed as a agent, named job/machine agent. To establish job allocations, job agents and machine agents have to bid interactively. Management agent plays as a system supervisor and coordinator to manage negotiation processes between job agents and machine agents to ensure the global objectives such as minimizing total jobs’ tardiness and flow time, balancing machines’ loading, and maximizing total revenue can be achieved. Eventually, experiments are conducted to evaluate the performance of the proposed system. The result shows that the proposed architecture provides a parallel eligible machines scheduling solutions with a better performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.