Abstract

The electro-etching process is the critical process in the production of aluminum foil. The manufacturing process has many parallel machines with three distinct voltage equipments. Therefore, the production scheduling is parallel-machine and its choices of eligibility. In this paper, an agent-based negotiation approach is proposed to develop a distributed parallel-machine scheduling application in this manufacturing environment. The agent-based system comprises three types of agents, job agents, machine agents and management agent, to represent jobs, machines and supervisor respectively. To establish job allocations, job agents and machine agents have to bid interactively. A negotiation protocol is developed for negotiations between job agents and machine agents. And management agent is added, and plays as a centralized controller and a system coordinator. The main function of management agent is to manage negotiations between job agents and machine agents to ensure that the global objectives of system primary are being observed. It is possible to consider one or several different global objectives such as minimizing total jobs' tardiness and flow time, balancing machines' loading, and maximizing total revenue. This paper will provide an integrated agent-based parallel eligible machines scheduling solution with a better global performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.