Abstract

Large-scale integration of intermittent energy has brought many problems to active power dispatching of the power grid, which will not only increase the operation cost, but also increase the operation risk. This paper developed a multi-time scale scheduling strategy, integrated day-ahead scheduling, intra-day dispatching and automatic generation control (AGC) system, in order to ensure the safe and stable operation of power grid. The strategy aims to minimize the sum of operating costs of power system, and sets six constraints such as power flow constraint, to analyse and optimize the dispatching process of power systems. After simulation and analysis by Particle Swarm Optimization (PSO) algorithm, the results show that the strategy has a significant optimization on the power system with intermittent energy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.