Abstract
The Automatic Generation Control (AGC) system very important system for control on output power from generators in power system, two or more power plants. AGC system need full control system on power grid before working, like SCADA system in normally case. but in emergency case like split operation power system mode, happen when disconnected super transmission line between two area(Tie line) in one power system the AGC system automatically not work. in this paper show the Manual technical method to help the operators of power system to lead the power system as AGC system work as temporary mode.[3]
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.