Abstract

ABSTRACT This work deals with the optimal decisions for materials handling in open-pit mines. The main purpose of this research is to present a multi-stage approach, which has three sequential stages: (a) fleet size selection stage, (b) fleet allocation stage, and (c) real-time truck dispatching stage. At first, a simulation-based optimisation method is provided to evaluate the optimal number of trucks. Then, a new heuristic algorithm is developed for making operational decisions. To evaluate the performance of the proposed framework, the dispatching algorithm used by Modular Mining DISPATCH is developed. The results indicate that the proposed method yields fairly good performance.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.