Abstract

Flow shop production system – compared to other economically important production systems – is popular in real manufacturing environments. This study focuses on the flow shop with multiprocessor scheduling problem (FSMP), and develops an improved particle swarm optimisation heuristic to solve it. Additionally, this study designs an integer programming model to perform effectiveness and robustness testing on the proposed heuristic. Experimental results demonstrate a 10% to 50% improvement in the effectiveness of the proposed heuristic in small-scale problem tests, and a 10% to 40% improvement in the robustness of the heuristic in large-scale problem tests, indicating extremely satisfactory performance.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.