Abstract In order to solve the problems of data acquisition, quantitative analysis and model solving in the field of construction schedule optimization, a construction schedule optimization system based on genetic algorithm was constructed. On this basis, the construction schedule two-stage multi-objective optimization models of “duration-cost” and “fixed duration-resource equilibrium” are established, which aim at the lowest cost and resource equilibrium. Through the investigation and analysis of the project contract documents, the energy consumption and cost of the normal construction and emergency construction state of the contract plan of the basic project part (from the beginning of precipitation activities to the end of +0) are obtained. This section was optimized for the analysis. The genetic algorithm is used to solve the model, and the optimal duration of each process and the optimal start time of non-critical process are determined. The feasibility and effectiveness of the system and model are verified by practical application in the actual project, which provides support for determining the construction schedule scientifically and reasonably and helps to improve the construction schedule technical application effect and construction schedule management level.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call