Abstract

Phasor measurement unit plays a great role in wide-area measurement system (WAMS) in power system. Based on analysis of observability of each bus while one of PMUs fails and under the precondition of full network observability, this paper presents a multi-objective optimal model of PMU placement with the objectives of minimization of the number of PMU and maximization of the N − 1 measurement reliability. A new NSDE algorithm, which is an organic integration of Pareto non-dominated sorting operation and differential evolution algorithm, is designed for the model. It improved individual crowding mechanism and mutation strategy effectively. Illustrative results on the 14- and 39-bus IEEE systems are presented to show the superiorities of this algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.