Abstract

ABSTRACTAn efficient, cost-effective multi-objective generation expansion planning (GEP) with Load Forecast (LF) uncertainty is described and evaluated in this article. The aspects that are considered in this multi-objective GEP model are cost, gas emission, energy price risk, fuel consumption and reliability of the generating units. The retirement of existing generating units is included in the projected model as these units reach their maximumLlifetime. To solve the projected generation expansion and retirement planning model, a Chaotic Grasshopper Optimisation Algorithm (CGOA) is proposed and it is applied into 6-, 14- and 24-year planning periods, and numerical result shows that GEP provides a cost-effective solution with less emission.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.