Abstract

Construction industry is one of the pillars of rapid economic development. The optimization of construction project management can greatly optimize the cycle, cost and quality of projects. In this paper, the multi-objective management optimization model of construction projects and the particle swarm optimization (PSO) algorithm for calculating the optimal solution of the model are briefly introduced, genetic operators are introduced into the PSO algorithm to prevent "premature", so as to improve the accuracy of the solution, and then case analysis is performed on a single-storey building project. The results show that the algorithm converges to stability and obtains the optimum solution set after 400 times of iterations and a total of 63250 s. The construction period of each process of the solution with the shortest total construction period in the optimum solution set is shorter than that before optimization, the total construction period reduces by 56 days, the total cost reduces by 520,000 yuan, and the total quality increases by 3.58. In summary, the improved PSO algorithm can effectively optimize the management of construction projects.

Highlights

  • Construction industry plays an indelible role in the rapid economic development [1]

  • The multi-objective management optimization model of construction projects and the particle swarm optimization (PSO) algorithm for calculating the optimal solution of the model are briefly introduced, genetic operators are introduced into the PSO algorithm to prevent "premature", so as to improve the accuracy of the solution, and case analysis is performed on a single-story building project

  • Where T represents the total construction period of the construction project, Ti represents the time consumed in the i-th working process, and N represents the set of work in the key path

Read more

Summary

Introduction

Whether building materials or labor force are disposable, different types of construction projects have different plans, and plans are disposable. There is basically no case of modifying the plan after half of the construction according to the plan, so it needs to perform reasonable optimization allocation on the projects in the construction planning [2]. The main objectives of management optimization of construction projects are construction period, cost and quality, and the relevance between the optimization objectives is high. The problem of construction management optimization is transformed into a problem of multi-objective optimization, and the balance is obtained from the multi-objective to achieve the optimization effect of short construction period, low cost and high quality as far as possible [3]

Related works of engineering projects
Multi-objective management optimization model for construction projects
The improved PSO algorithm
I 10 K 12 M 13 N 14 O 15 P 16
Case overview
Parameter setting
Optimization results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.