Abstract

In land development and utilization projects, managers rarely consider the loss of ecosystem service value, often resulting in waste of resources. Based on the land development and utilization project, this paper proposes a multi-indicator cost-benefit comprehensive analysis model (MCCAM). MCCAM divides the four aspects of the indicator system by dichotomy, including determining resource loss costs through MESV, calculating environmental degradation costs using delay factors, considering project planning factors and market fluctuations, and correcting economic benefits and costs. On the other hand, MCCAM quantifies the value of the ecosystem service value model and combines the non-equalized cobweb model with time-delay effects to modify the model parameters. According to the sensitivity analysis of the model, this model provides effective suggestions for the planning and management personnel of the land development and utilization project.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.