Abstract

Concept of sustainable development implies an effective long-term development, both in developed and developing countries, and must be based on three pillars: environmental protection, economic development and social cohesion, both on the state and on a global level. This clear definition of sustainable development suggests a necessity of a combined action on environmental protection, economic development and the achievement of social cohesion. As a rule, by investing in environmental protection projects, power generation companies implement previously defined growth targets, development policies, and business strategies. Investment projects for the given coal type are considered as the capital ones, for they use great financial resources, significant resources and are long-lasting. The companies untertake investing in such projects to be affirmed in the new business environment, adapt to anticipated changes or to overcome the handicaps of their current position and thus adjust their production capabilities with the opportunities offered by the market. All the above implies that environmentally based capital project investments are the prerequisite of existence, sustainable growth and the acquisition of competitive advantages. However, investing in such projects is a very complex process comprised of multidimensional testing activities of all relevant determinants of future conditions and changes that the project entails. Bearing in mind that such projects are associated with the company's strategic development objectives, in the realization of such projects all the internal and external factors of development shall be taken into account, as well as a number of constraints arising from the socio-economic environment.

Highlights

  • S obzirom na to da su principi analitičkog hijerarhijskog postupka ocene (AHP) metode poznati stručnoj javnosti i dostupni na brojnim internet stranicama u tekstu koji sledi dat je kraći prikaz primene AHP metode kod izbora optimalne varijante snabdevanja krečnjakom za potrebe odsumporavanja dimnih gasova TE Ugljevik

  • Interna stopa povrata projekta izračunava se metodom pokušaja i greške

  • Ako se dobije pozitivna vrednost, postupak se nastavlja tako što se diskontna stopa povećava sve do momenta dok se ne dobija negativna neto sadašnja vrednost projekta, zatim se interpolacijom u okviru ove dve diskontne stope traži interna stopa povrata koja neto sadašnju vrednost projekta svodi na nulu

Read more

Summary

STRUČNI RAD

Danas je zaštita okoline međunarodni standard i obaveza. Usvajanjem Direktive o integrisanoj kontroli i prevenciji zagađenja (IPPC direktiva – IPPC, Integrated Prevention Pollution Control 96/61/EC) [1], Evropska Unija je postavila ambiciozni cilj visokog nivoa zaštite okoline u celini i uvela koncept održivog razvoja za široki spektar zagađujućih industrijskih aktivnosti uključujući rudarstvo i metalurgiju, energetiku, i niz drugih oblasti. Prolazeći kroz jedan veoma dug period, od skromno prezentovanih prvih razmišljanja o potrebi zaštite vazduha i životne sredine, pa sve do aktivnosti koje sasvim realno vode ka ostvarenju ove ideje, konstantno je prisutan dualizam neophodnosti preduzimanja ovih mera i činjenice da je odsumporavanje dimnih gasova jedan skup proces, koji trajno opterećuje proizvodnu cenu električne energije. Bilo je zamajac za konačno finaliziranje ideje, o izgradnji postrojenja za odsumporavanje dimnih gasova, pogotovo što je postojala, i postoji, opasnost zaustavljanja rada i pre isteka životnog veka Termoelektrane. U cilju rešavanja ovog pitanja, obezbeđen je kredit japanske vlade, odnosno od Japan International Cooperation Agency (JICA), urađena je konceptualna studija, Studija izvodljivosti o izgradnji sistema za odsumporavanje dimnog gasa, kao i sproveden postupak pretkvalifikacije potencijalnih izvođača za izgradnju postrojenja za odsumporavanje dimnih gasova (ODG), a u završnoj fazi je izrada tenderskog dokumenta za prikupljanje ponuda iz reda kvalifikovanih ponuđača. Na slici 1 data je pojednostavljena tehnološka šema postupka odsumporavanja dimnih gasova mokrim postupkom, a na slici 2 tehnološka šema sa glavnom opremom

Otpadne vode
Proces Prikaz
Efikasnost uklanjanja
Opis primenjene metodologije
Kratak opis AHP metode
Kratak prikaz AHP kalkulacija
Eliminatorni kriterijum Da Ne Da Ne Ne Ne Ne Da
Opis analitičkog postupka ocene za definisane kriterijume
REZULTATI OCENE
Statička ocena efikasnosti
Generalna ocena bilansa uspeha i finansijskog toka
Prag rentabilnosti
Dinamička ocena efikasnosti investicije
Diskontna stopa Sadašnja vrednost budućih dobitaka Diskontnastopa
Findings
SUMMARY
Full Text