Abstract

It is one of the challenges to solve the power quality problems such as voltage fluctuation and voltage exceeding limit caused by the largescale grid connection of distributed photovoltaic (DPV). Considering the operation speed of voltage regulation control in distribution network, this paper proposes a voltage hierarchical control method based on multi-agent structure. The mathematical models of this method are divided into dualtime scale global optimization model and event-triggered voltage regional autonomy model, aiming at solving the problem of operation safety of voltage exceeding limit. The method is verified by a specific example. The results show that this method can respond quickly to the change of power grid voltage, and help to reduce the risk of voltage exceeding the limit, and improve the operation economy of distribution network.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call