Abstract

In the next years the Gesellschaft fuer Schwerionenforschung and international partners will realize the new international accelerator Facility for Antiproton and Ion Research (FAIR) for research with heavy ions, radioactive ions, and antiprotons. Two important storage rings of FAIR are the collector ring (CR) and the recycled experimental storage ring (RESR), which are located together in the same building: The CR is optimized for fast cooling of heavy ions and antiprotons, while the RESR is mainly used for accumulation of antiprotons.The concrete shielding for the CR and RESR is presented on the basis of several Monte Carlo simulations for radiation transport with the latest version of the FLUKA code. Extensive shielding calculations had to be done because of diverse beam types including different locations of beam losses. The goal of the simulations is to reveal possible weak points in the shielding and to ensure a dose rate outside the storage rings and in the technical supplies’ room to a value of <0.5 μSv/h so that this area is accessible without any restrictions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.