Abstract

AbstractTwo versions of Phase II attribute+variable (DVMAX) control charts are investigated for monitoring the covariance matrix of bivariate processes. Monitoring always starts with an attribute chart employing the Max D control chart and, depending on the outcome, a variable control chart named VMAX chart is run at a second stage to check for process stability. In the first version, denoted as the chart, two independent samples are used at the two stages of the same inspection; with the second version, denoted as the chart, the same sample is used at both the first and second stage of the same inspection. This approach, based on the implementation of two types of charts, can be designed to be more advantageous than a single variable control chart in terms of detection speed of a shift in the covariance matrix. In general, we conclude that the control charts not only shows the best statistical performance but also presents a lower average sampling cost. A numerical example illustrates the implementation of the proposed control charts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.