Abstract

This paper presents the current status of the grid-connected photovoltaic (GCPV) system installed in Malaysia. There are 113 sites with total PV capacity power, of 1008.73 kWp GCPV systems are monitored by the Photovoltaic Sys- tem Monitoring Centre (PVSMC). This paper focus on the PV system performances under Malaysian Building Integrated Photovoltaic (MBIPV) project which relates the performance of the system failures due to technical and environmental factors. Both factors will contribute to the reduction of the PV system performances in terms of final yield. It would later lead to energy inefficiency as the energy harvested from PV array will be wasted which later cause the time taken for en- ergy payback period of the system to be lengthen. Proper and sufficient practical knowledge in designing a GCPV system is needed in order to achieve maximum energy production. A database with minimum period of 4 years was selected as the benchmark for problem identification at PVs site in hot and humid climate. All issues affecting the system performances and BOS component of the GCPV system for optimization purpose.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.