Abstract

The large span spatial steel is used in chop manufactory of the Chengdu integrated circuit manufacturing project. Because of the complex construction conditions, high altitude cumulative slip construction is adopted to ensure the installation quality and construction requirements of the structure. The vertical displacement, bearing synchronicity and key bar stress during the sliding process are monitored in same time. The smooth implementation of the slip construction scheme is guaranteed in that way. In addition, the monitoring data are analyzed, and the reliability of the sliding construction technology is demonstrated, which provides reference for the standardization of the slippage construction of the large span steel roof in China..

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.