Abstract

In Fuyu oil field wells spit mudstone serious, sloughing, lost the problems on the top of the fish, take relief well construction method, using new drilling trajectory, through reservoir perforated interval as China Unicom media, from and old wells trajectory formed a U-shaped connecting device, eventually set up a China Unicom, so as to implement to new wells trajectory cement injection to sealed wells eyes return channel to. The technology to solve casing fault at the lower part of the fish top completely lost without channel, shallow mudstone strata serious collapse and leakage, et in sleeve and a lot of spit mudstone and operation cannot on the lower part of wellbore and reservoir were blocked. In the communication of the trajectory of the new and old wells by chemical plugging agent and augmented injection provided measures of pressure, relative effective reduces the invalid diversion effect, improve good communication relationship between new and old wells eyes and Unicom performance, finally realizes the effective sealing effect. In the field application, it has achieved good results, effectively blocking the difficult wells, and provides a new method for the safety management of Fuyu oilfield.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.