Abstract

Jetted conductor setting depth is crucial for deep-water drilling. This paper presents an innovative method for determining the shallow soil resistance strength recovery factor based on the field data of Equatorial Guinea bay. It shows that the soil strength recovery factor of Equatorial Guinea bay is lower than that of the Gulf of Mexico. The conductor setting depth calculation referring to other place will have a high risk of wellhead sinking. According to the newly established designing charts, the conductor setting depth was recommended for the S1 well. Each preferred set-up period requires a specific setting depth. If the chosen set-up period is 2 days, the expected setting depth of a 36″ conductor should be 250 ft (76.2 m) and, similarly, 295 ft (89.9 m) for a 30″ conductor. The relationship between set-up period and surface conductor setting depth is established as well. Wellhead landed load appears to be the crucial factor for determining the conductor setting depth. The rationality of the newly developed shallow soil strength recovery model for the Equatorial Guinea deep-water block was also confirmed by the field data.

Highlights

  • Surface conductors are important parts of the well structure in deep-water drilling

  • It consists of surface conductor, mudmat, low pressure wellhead, high pressure wellhead, technical casing, slope indicator, etc

  • The running technology of jetting while drilling concerning surface conductor have currently grown into a universal phenomenon in the field of deep-water drilling [6,7]

Read more

Summary

Introduction

Surface conductors ( known as surface casing or jetted conductors) are important parts of the well structure in deep-water drilling. They play an important role in constructing the wellhead, supporting the underwater blowout preventer stack, and in all casing strings. The running technology of jetting while drilling concerning surface conductor have currently grown into a universal phenomenon in the field of deep-water drilling [6,7]. TThhee mmeeaassuurreedd ddaattaa ccoonncceerrnniinngg tthhee sshheeaarr ssttrreennggtthh ooff sshhaallllooww ssooiill iinn SSOO11 aanndd SSOO22 hhoolleess aarree pprreesseenntteedd iinnFFiigguurree. BBaasseedd oonnpprroovviiddeeddppaarraammeetteerrss ooffsshhaalllloowwssooiill ssttrreennggtthh ooff SSOO11 aanndd SSOO22 hhoolleess,, tthhee aavveerraaggee pprroofifillee ooff sshheeaarr ssttrreennggtthh ooff sshhaallllooww ssooiill wwaass eessttaabblliisshheedd ((bbllaacckk ssoolliidd lliinnee iinn FFiigguurree 22)).

CEIBA-6
Wellhead Landed Load Calculation
Jetting Conductor Depth Design According to Different Set-Up Time