Abstract

AbstractIn this research paper, we discuss the use of calibration technique to propose some new estimators under stratified sampling design and its use in reliability engineering. We first proposed the estimators using the calibration technique and then modify the already existing control charts such as Shewhart, exponentially weighted moving average and hybrid exponentially weighted moving averages using these calibration estimators. We also have studied the use of the proposed control charts in detail by showing their efficiency in terms of average run length. We find out that a hybrid control chart is more effective to detect the early shifts in the mean of the process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.