Abstract

We modify various Shewhart charts such as the np control chart, X-bar control, and S 2 control chart using modified multiple dependent state sampling. The efficiency of the three charts is evaluated in terms of the average run lengths. The operational procedure of the proposed charts is discussed using simulation and factory data. We showed the efficiency of the proposed control chart over the existing control charts in terms of average run length. The results show that the proposed control charts are more effective to detect a smaller shift in the process than existing Shewhart charts.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.