Abstract
The High Energy Accelerator Research Organization (KEK) has two light sources: Photon Factory (PF, 2.5 GeV) and Photon Factory Advanced Ring (PF-AR, 6.5 GeV). In 2017, the operation of a new beam transport line (BT) of PF-AR was started, and the simultaneous top-up injection for both PF and PF-AR was realized. These days, there have been strong demands for the reduction of the operating cost of accelerators, and its importance is greater in PF-AR with higher ring-energy of 6.5 GeV. In 2019, the 5 GeV operation was started in PF-AR. However, the new BT of PF-AR (ARBT) was designed for the energy of 6.5 GeV, then the simultaneous top-up injection is no longer available under the condition of 5 GeV operation of PF-AR and 2.5 GeV operation of PF. In order to mitigate this impact, the pseudo-top-top injection has been employed by fine-tuning the current of a common DC bending magnet placed at the intersection of ARBT and the BT of PF (PFBT) within a given time frame. However, this scheme reduces the flexibility of the operation schedules, and will not be able to respond adequately to low emittance optics of PF-AR that may bring the shorter beam lifetime. In order to realize true-top-up injection, a modification of BTs’ optics design was carried out to add new horizontal steering magnets and a flattened-duct. The beam commissioning succeeded and the application to the user-run will start in this May. This time, details of modification and its extended plan will be presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.