Abstract

The Super-KEKB[1] personnel protection system (PPS) takes care of not only Super-KEKB accelerator, but also Photon Factory - Advanced Ring (PF-AR), Positron Damping Ring (PDR)[2] and their beam transport lines (BT)[3]. The logic of the PPS has been changed to adapt the new accelerator operation scheme. The Experimental Physics and Industrial Control System (EPICS) was introduced into the PPS. Many tools developed under EPICS environment are used.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call