Abstract

There are multiple complaints that existing project risk quantification methods—both parametric and Monte Carlo—fail to produce accurate project duration and cost-risk contingencies in a majority of cases. It is shown that major components of project risk exposure—non-linear risk interactions—pertaining to complex projects are not taken into account. It is argued that a project system consists of two interacting subsystems: a project structure subsystem (PSS) and a project delivery subsystem (PDS). Any misalignments or imbalances between these two subsystems (PSS–PDS mismatches) are associated with the non-linear risk interactions. Principles of risk quantification are developed to take into account three types of non-linear risk interactions in complex projects: internal risk amplifications due to existing ‘chronic’ project system issues, knock-on interactions, and risk compounding. Modified bowtie diagrams for the three types of risk interactions are developed to identify and address interacting risks. A framework to visualize dynamic risk patterns in affinities of interacting risks is proposed. Required mathematical expressions and templates to factor relevant risk interactions to Monte Carlo models are developed. Business cases are discussed to demonstrate the power of the newly-developed non-linear Monte Carlo methodology (non-linear integrated schedule and cost risk analysis (N-SCRA)). A project system dynamics methodology based on rework cycles is adopted as a supporting risk quantification tool. Comparison of results yielded by the non-linear Monte Carlo and system dynamics models demonstrates a good alignment of the two methodologies. All developed Monte Carlo and system dynamics models are available on the book’s companion website.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call