Abstract
Contents: Foreword, Philip Rawlings Foreword, Charles Bosler Preface Introduction: why conduct cost risk analysis? Cost risk analysis basics: the three-point estimate and an analytic solution, the method of moments What is Monte Carlo simulation and how does it apply to cost risk analysis? Collecting high-quality data on cost risk methods and challenges Correlation between project element costs reflects common risk drivers and implies more cost risk at the project level Using risk register risks to drive the cost risk analysis: the 'risk driver' method Preparing for integrated cost and schedule risk analysis Essentials of integrated cost and schedule risk analysis Integrated cost and schedule risk analysis: method and case study basic results Integrated cost and schedule risk analysis advanced results Summary of integrated cost and schedule risk analysis Index.