Abstract
Abstract Models relating system-wide average temperature to total system load were developed for the Virginia Power and Duke Power service areas in the southeastern United States. Daily data for the 1985–91 period were used. The influence of temperature on load was at a minimum around 18°C and increased more rapidly with increasing temperatures than with decreasing ones. The response was sensitive to the day of the week, and models using separate weekdays as well as one using pooled data were created. None adequately accounted for civic holidays or for extreme temperatures. Estimates of average loads over a 3-month period, however, were accurate to within ±3%. The models were used to transform the probability distribution of 3-month average temperatures for each system, derived from the historical record, into load probabilities. These were used with the categorical temperature probabilities given by the National Weather Service long-lead forecasts to estimate the forecast load probabilities. In summer an...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.