Abstract

Computation of the generator neutral grounding system through a distribution transformer can be done through manual calculations. A lot of data is used in calculations so that the possibility of recurring calculations. This is very difficult and causes a large difference in the calculation results. Therefore, a computer-based computing system is needed to overcome problems like this. Several papers have been developed on the calculation of the voltage capacity through medium grounding, the length of the electrodes attached to the ground of the generator, one-phase faults to the ground, and zero sequence current disturbances. Therefore, this paper discusses modeling using the LabView Graphical User Interface (GUI) application to create it easier to design neutral grounding for equipment. As an implementation, modeling using Std. C62.92.2TM-2017 data and the results of the generator neutral grounding design can be easy, faster, and more accurate.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call