Abstract

This paper presents the software package that implements the ability to study large-scale hydroelectric power systems with complex hydraulic and electrical connections, planning long-term regime of hydro power plant with the requirements of water users on the example of the Votkinsk hydroelectric plants, and training for the calculation of the water-energy regime of hydroelectric power. The complex is developed in the high-level Python programming language based on the current requirements specified in the rules for the use of water resources of the Votkinsk reservoir. The calculation in the software package is performed by the direct method. Given that the software package is suitable for both research and training. To improve the quality of the calculation, we consider method of swarm optimization. The complex is planned to be used in the course of laboratory work on the planning of the HPP operation mode, and for checking course papers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.